Richard Burbidge CHIRK

CURRENT UPLOAD LOG

CLICK REFRESH TO UPDATE AND HERE TO UPLOAD

100ArchitectConcept Design Options - Chirk Site CH-SD(90)10 to 13 issued at client meeting 12.11.200921/01/2010
101ArchitectConcept Design Options - Chirk Site Option 1,2 - CH(90)10,11 issued 07.12.0921/01/2010
102ArchitectDevelopment Report for Richard Burbidge Oswestry - Logistics Strategy Review - prepared in March 2009 by Supply Chain Planning Ltd Bedford21/01/2010
103ArchitectFinal Survey Drawings (by Survey Operations Dec09) - Survey Chirk-Topo-Elev-Floorplan21/01/2010
104ArchitectAdditional Information - OS Base Map Chirk, Site Visit Photos21/01/2010
105ArchitectUtility Report Information - Chirk21/01/2010
106ArchitectConcept Design Options - Chirk - discussed at client meeting 15.01.10 - EX(90)05, option 1,2 SD(90)10, SD(90)11 and new option 4 SD(90)1321/01/2010
107ArchitectFinal Survey Drawings (by Survey Operations Jan10) - Survey Chirk - Roof Plans25/01/2010
108ArchitectDesign Option 4 - Section North-South at North End of Site - Existing Terrain GA(90)10 and Schematic Proposal GA(90)1128/01/2010
109StructuralStructural Report - January 201008/02/2010
110ArchitectConcept Design Option 5 - SD(90)14 - issued to client 03-02-201023/02/2010
111StructuralFlood Risk Assessment Documents24/02/2010