101ArchitectEngagement 01 presentation boards from meeting held 15.09.09 (issued for information)01/10/2009
102ArchitectEngagement 02 presentation boards from meeting held 29.09.09 (issued for information)01/10/2009
103Architectphasing diagram issued for comments06/10/2009
104ArchitectEngagement 03 presentation in PDF format13/10/2009
105ArchitectExisting site plan issued for information19/10/2009
106ArchitectGIFA areas indicated on Ground-Second floor plans - issued for information19/10/2009
107ArchitectGround-Second floor GIFA plans revised to include proposed floor levels - issued for information22/10/2009
108ArchitectEngagement 04 presentation boards_03-11-09 (issued for information)03/11/2009
109ArchitectNorth Chadderton_Proposed floor plans (Ground-Second) issued in CAD format06/11/2009
110ArchitectEngagement 05 presentation - 17-11-09 (PDF format) issued for information17/11/2009
111ArchitectCurrent floor plans in .dwg and .PDF format (presented at Engagement 05 - 17-11-09)17/11/2009
112ArchitectFloor plans updated to reflect comments received from Engagement 0523/11/2009
113ArchitectCurrent floor plans (TY Ticket 112) with extent of Refresh, Refurb and New areas indicated.23/11/2009
114ArchitectCABE presentation_proposed sketch layouts for boards23/11/2009
115ArchitectDraft Ground & First Floor Plans with access / egress points for SBD Report02/12/2009
116ArchitectIPD1 - Taylor Young submitted drawings (all in PDF format - full size and scale) - 08 December 200910/12/2009
117ArchitectOldham BSF (North Chadderton) - IPD1 submitted ground, first and second floor plans issued in .dwg format (saved as AutoCAD 2004)18/12/2009
118ArchitectOldham BSF (North Chadderton) Phasing overview and key stage phases_Preliminary issue (.dwg and PDF format)21/01/2010
119ArchitectIPD 2 First CAD Plan Issue18/02/2010
120ArchitectFloor Construction Comparison Report22/02/2010
121ArchitectExisting school plans .dwg.format23/02/2010
122ArchitectCAD Plans latest issue25/02/2010
123ArchitectRevised CAD Plans Issue01/03/2010
124Architect1:50 Co-ordinated section Issue .dwg & pdf01/03/2010
125ArchitectFirst Floor Plan with initial draft structural grids indicated02/03/2010
126ArchitectPlans for Gate B404/03/2010
127ArchitectGIFA Check 09_03_1009/03/2010
128ArchitectNorth Chadderton_Scope of refurbishment (plans and written document)_Preliminary issue for comment.11/03/2010
129ArchitectElevations Issue11/03/2010
130ArchitectOldham BSF (North Chadderton)_Updated floor plans (Ground-Second)12/03/2010
131ArchitectCurrent Revit Model Upload16/03/2010
132ArchitectCurrent Plans18/03/2010
133ArchitectCurrent REVIT Model19/03/2010
134ArchitectCABE Issue22/03/2010
135ArchitectOldham BSF (North Chadderton)_Proposed elevations (22-03-10)22/03/2010
136ArchitectRevised Roof Plan23/03/2010
137ArchitectCurrent Revit Model24/03/2010
138ArchitectCurrent Plans26/03/2010
139ArchitectRevised floor plans - Ground-Second01/04/2010
140ArchitectLatest FFE drawings (North Chadderton) in PDF format14/04/2010
141ArchitectLatest FFE drawings (RC Oldham) in PDF format14/04/2010
142ArchitectRefurbishment_scope of works (in PDF format) and New build_specification (in PDF format)16/04/2010
143ArchitectFinal Plans19/04/2010
144ArchitectFinal Sections19/04/2010
145ArchitectExisting plans (BB98), Refurbishment scope drawings and amended NBS documents outlining refurbishment scope and new build elements19/04/2010
146ArchitectIPD2 submission drawings - Proposed elevations, Sections A-A, B-B and detailed wall sections. Minor amendments to proposed plans and refurb scope (Ground and first). All issued in PDF format @ full size.20/04/2010
147ArchitectIPD2 submitted document - IPD2-NC-REF-P-020 (Refurbishment scope document specification) minor amendments in line with RPSG comments regarding ventilation.20/04/2010
148ArchitectIPD2 submission drawings (Proposed Ground -Second floor plans with BB98 colour references and kitchen-catering area plan/reflected ceiling plan) issued in PDF format (full size)22/04/2010
149ArchitectCAD Plans Issue following Drawing Review 10/04/2323/04/2010
150ArchitectIPD2 Submission drawings (various - typical WC layouts/elevations, typical catering plans/section, typical external wall section -SIPS). Minor amendment to NBS (New build) - sanitaryware.29/04/2010
151ArchitectNorth Chadderton - IPD2 Final FFE submission drawings05/05/2010
152ArchitectNorth Chadderton - IPD2 Final submission scheme drawings05/05/2010
153ArchitectRC School - IPD2 Final FFE submission drawings05/05/2010
154ArchitectIPD2 (North Chadderton) NC-A-P-020 Cycle storage drawing10/05/2010
155ArchitectOldham BSF (North Chadderton) IPD2 Final drawings IPD2-NC-A-P-021-023 Zone Strategy drawings10/05/2010
156ArchitectOldham BSF (North Chadderton) IPD2 Final drawings IPD2-NC-A-P-025-027 FM integration and IPD2-NC-REF-P-020-025 Refresh-Renew-New Build11/05/2010
157ArchitectOldham BSF (North Chadderton) IPD2 Final drawings IPD2-NC-A-V-001 Entrance visualisation, IPD2-NC-A-V-002 Community Access visualisation, IPD2-NC-A-V-004 External Learning visualisation, IPD2-NC-A-V-005 Performing Arts visualisation, IPD2-NC-A-V-007 Exchange visualisation. Dwgs IPD2-NC-REF-P-023-025 amended (Notes removed)11/05/2010
158ArchitectPlanning Issue16/07/2010
159ArchitectFormal Planning Issue19/07/2010
160ArchitectPlanning Issue - Revised Roof Plan20/07/2010
161ArchitectTemporary Building Detailed Plan and Sections22/07/2010
162ArchitectPB Engagement 02 Plan Issue13/09/2010
163ArchitectIPD2 Plans re-issue, alongside current plans for comparison purposes14/09/2010
164ArchitectFinal Frozen Plans for costing - encompassing all school & L.A. comments14/09/2010
165ArchitectBuilding Control - Initial Notice Drawings20/09/2010
166ArchitectAdditional Planning Drawings - car parking; existing & proposed22/09/2010
167ArchitectFinal GA's with amendments made from Engagement Session 21/09/1022/09/2010
168ArchitectCreative Zone indicative lightwell views23/09/2010
169ArchitectFrozen GA's following Engagement with school 28/09/1029/09/2010
170ArchitectContractors Proposals package for FC - First Issue29/09/2010
171ArchitectTicket 170 GA's: re-issued with colours removed for the production of sub-consultants CP drawings04/10/2010
172ArchitectArchitectural GIFA measure drawing and calculation spreadsheet06/10/2010
173ArchitectSpecification Issue - Contractor's Proposals12/10/2010
174ArchitectRevised GA's with kitchen, wc layouts & draft rwp positions added12/10/2010
175ArchitectCP SOA13/10/2010
176ArchitectCP Fire Strategy Drawings13/10/2010
177ArchitectRe-issue of locked grids integrated in to current First Floor GA13/10/2010
178ArchitectCP Issue Roof Plan13/10/2010
179ArchitectCP Drawings re-issued noted as 'Contractors Proposals'13/10/2010
180ArchitectDrawings: CP-NC-REF-P-020 - ground floor refurbishment plan; CP-NC-REF-P-021 - first floor refurbishment plan; CP-NC-REF-P-022 - second floor refurbishment plan; issued for Contractor's Proposals drawing package.14/10/2010
181ArchitectDrawings: CP-MC-A-P-014-Ground Floor Finishes Plan, CP-MC-A-P-015-First Floor Finishes Plan & CP-MC-A-P-016-Second Floor Finishes Plan; issued for information.26/10/2010
182ArchitectUpdated Temporary Accommodation Drawings for Planning27/10/2010
183ArchitectDrawings: CP-MC-A-P-014-Ground Floor Finishes Plan, CP-MC-A-P-015-First Floor Finishes Plan; CP-MC-A-P-016-Second Floor Finishes Plan & Area Data Sheets revised and issued for information.28/10/2010
184ArchitectDrawings CP_NC_REF_P_020 - ground floor Refurb scope plan & CP_NC_REF_P_022 - second floor Refurb scope plan updated in line with latest comments.29/10/2010
185ArchitectFinal Contractor's Proposals - GAs and Finishes11/11/2010
186ArchitectRefurb Drawings - Final Contractor's Proposals12/11/2010
187ArchitectRefurb Drawings - Final Contractor's Proposals - key amendment12/11/2010
188ArchitectFinal Contractor's Proposals - Amended Finishes Plans - Gd & 2nd Floor15/11/2010
189ArchitectFinal Contractor's Proposals - Amended Finishes Ground Floor Plan16/11/2010
190ArchitectFinal Contractor's Proposals - Co-ordinated_External_Wall_Sections_New_Build16/11/2010
191ArchitectFinal Contractor's Proposals - Revised First Floor Fire Strategy Integration Plan16/11/2010
192ArchitectFinal Contractor's Proposals - ICT Areas Plans17/11/2010
193ArchitectProposed Site Plan (indicating temporary accommodation) with Admin. Block amended26/11/2010
194ArchitectPreliminary issue of Taylor Young drawing DT(16)001: Indicative Lift Pit Section detail, for comment.30/11/2010
195ArchitectGrid setting out plan02/12/2010
196ArchitectRevised drawing PL(20)006 Grid setting out plan08/12/2010
197ArchitectProvisional Ground Floor GA Pl(20)001 issued for rainwater harvesting / sprinkler tank design.09/12/2010
198Structural10/12/2010
199ArchitectUpload of revised temporary accommodation planning application drawing TA/NA.001 10/12/2010
200ArchitectUpload of temporary planning application drawing number PL-NC-A-SS-007, illustrating the site relationship between the temporary general teaching accommodation, temporary English teaching accommodation and 12 Coventry Road.14/12/2010
201ArchitectRevised Grid16/12/2010
202ArchitectSketch issue of Fire Fighting Stair 01 (G.206) to Fire Engineer for review of proposed stair/lobby layout.17/12/2010
203ArchitectPreliminary Issue of PL(22)004-Setting out of Internal Walls ground floor. PL(23)001 Slab edge setting out ground floor, PL(20)00a/b Level Key plans.24/12/2010
204ArchitectPreliminary issue of SIPS wing elevations07/01/2011
205ArchitectRe-issue of Taylor Young drawing PL(23)001 - Ground Floor Slab Edge/Service Penetration setting out. Amendment to slab edge parallel to GL:B02 between GL: A04 to A07. Slab edge dimensioned 64mm beyond GL:B02. Drawing issued in DWG/PDF format. First issue of Taylor Young sketch drawing SK01_110110 - Indicative Slab Edge / Curtain Walling detail. Drawing issued in DWG/PDF format.10/01/2011
206ArchitectFirst upload of DRAFT status stair drawings PL(24)001 to 008 for Balfour Beatty sub contractor meeting.11/01/2011
207ArchitectPL(20)_001-004_General Arrangement Plans - Provisional Issue.17/01/2011
208ArchitectTemporary English Block Elevation A - Extract18/01/2011
209ArchitectFabric Build-up Report18/01/2011
210ArchitectTemporary Accommodation English Block Sectional Elevation B-B19/01/2011
211ArchitectDraft substructure package WP170 / WP180 / WP 22025/01/2011
212ArchitectGA Issue26/01/2011
213ArchitectUpload of work packages WP170 (Waterproof Membranes), WP180 (Concrete Ground Floor), WP220 (In-Situ concrete floors) and WP250 (Precast concrete stairs) at FOR COMMENT status.31/01/2011
214ArchitectUpload of WP 170, 180 & 220 for comment04/02/2011
215ArchitectDrinking water fountain positions - Draft issue08/02/2011
216ArchitectUpload of Taylor Young drawing EL(21)006 - SIPS elevation drawing indicating structural opening sizes.08/02/2011
217ArchitectUpload of work package WP810 - Lifts, Taylor Young drawings PL(20)010-014 inclusive.09/02/2011
218ArchitectUpload of 3D modelling.10/02/2011
219ArchitectRevit Model Issue gbXML format11/02/2011
220ArchitectWork package 320 rainwater goods. PL(23)001, PL(23)002, PL(23)003, PL(23)00423/02/2011
221ArchitectCanopies Drawings07/03/2011
222ArchitectUpload of work package 370 including window types, window schedule, typical window details and window elevations.07/03/2011
223ArchitectUpload of General Arrangement drawings for issue to design team members for information purposes only. Drawings issued prior to work package 400 / 40508/03/2011
224ArchitectInternal Partition NBS09/03/2011
225ArchitectBuilding Control Issue14/03/2011
226ArchitectWork Package 390. Brise Soleil. Preliminary Issue.14/03/2011
227ArchitectWork Package 410 - First Fix Joinery (Inclusion Wing)15/03/2011
228ArchitectOpenable Window ‘Free Ventilation Area’ Report to RPSG and Flow Analysis16/03/2011
229ArchitectAdditional Sections Requested by Balfour Beatty BB03522/03/2011
230ArchitectWork Package 370 - Curtain Walling (Drawings & NBS)24/03/2011
231ArchitectGA's issued for window references25/03/2011
232ArchitectRevised Roof GA incorporating Areas for Rain Water Harvesting 07/04/2011
233ArchitectReturned TY comments on BB mark-ups rec'd 22/03/1112/04/2011
234ArchitectRevised package of information following BB's comments18/04/2011
235ArchitectCurrent Revit Working Model19/04/2011
236ArchitectWork Package 530 - Internal Doors and Ironmongery03/05/2011
237ArchitectWP 426 Service Riser Grilles05/05/2011
238ArchitectFirst issue of work package 516 - Internal Screens06/05/2011
239Architectfirst Issue of Fire Plans.Work Package 230.06/05/2011
240ArchitectWork Package 610 - Joinery Items/ Reception Desk06/05/2011
241ArchitectRevised External Brickwork / Blockwork WP 300 updated and issued following BB comments10/05/2011
242ArchitectWP315 Render Package First Issue19/05/2011
243Architect-deleted-23/05/2011
244ArchitectRevised NBS specifications23/05/2011
245Architectupload of TY external door schedule SC(32)001 incorporating comments received from BBCNL.25/05/2011
246ArchitectVideo wall drawing - first issue EL(21)00726/05/2011
247ArchitectUpload of SK01_110528 illustrating clashing of steel work adj. hellerup stair. Issued for comment.26/05/2011
248ArchitectDrawing PL(23)005 FL NC-TY-23-0-005 Ground & First Floor Under-Slab Insulation upload - first issue27/05/2011
249ArchitectUpload of drawings PL(32)001, 002 & 003 Door access controls. Drawings created follwoing request of BBCNL [K.Harrison] following mtg with NC School.31/05/2011
250ArchitectKillelea Drawing Issue02/06/2011
251ArchitectTaylor Young drawings PL(32)001-003; Fusion Ref: NC-TY-32-0-001, NC-TY-32-1-002 and NC-TY-32-2-003 updated [key legend simplified and BBCNL notes removed] following meeting between BBNCL and N.C. School [01/06/11].02/06/2011
252ArchitectWork Package 520: Suspended Ceilings; NBS spec. sections K10 & K40; GF Ceiling Layout PL(35)001; FF Ceiling Layout PL(35)002; SF Ceiling Layout PL(35)003 & Typical Suspended Ceiling Perimeter Detail DT(35)00102/06/2011
253ArchitectDT-22(10,20,21-23)amended for issue. 03/06/2011
254ArchitectThe following drawings re-issued following additional information recieved. PL(27)001 PL(52)001-003 PL(23)001-00406/06/2011
255ArchitectGrid Setting Out Plan Issue07/06/2011
256ArchitectWP314 - Revised Cladding Package Issue09/06/2011
257ArchitectUpload of Taylor Young drawings NC-TY-34-0-001, NC-TY-34-1-002, NC-TY-34-2-003, NC-TY-34-D-001 to 004, NC-TY-24-D-001 to 010 and NC-TY-24-D-015. All drawings uploaded as part of balustrade drawing package.13/06/2011
258ArchitectDrawings re-caregorised from Cladding to External Masonry13/06/2011
259ArchitectUpload of drwaing SK01_110614 full 3d Revit Model for issue to Killelea. Drawing status - FOR COMMENT14/06/2011
260ArchitectElevation issue to Killelea15/06/2011
261ArchitectRoof Openings - Trimmer Positions drawing PL(27)002 uploaded17/06/2011
262Architectbelow-Ground masonry setting-out PL(23)00620/06/2011
263ArchitectSketch of Plan Detail Of Facetted Beam Between GL L01 & B0923/06/2011
264ArchitectFinishes package: PL(40)001 - GF finishes plan; PL(40)002 - FF finishes plan; PL(40)003 - SF finishes plan; 27/06/2011
265ArchitectPL(74)001-Ground Floor Sanitary Locations; PL(74)002-First Floor Sanitary Locations; PL(74)003-Second Floor Sanitary Locations DT(74)001-Combined WC layout all Floors; DT(74)002-Vanity Unit/Fully Recessed Island; DT(74)003- Vanity Unit/Semi Recessed Island; DT(74)004-Typical Cubicles/IPS Layout; DT(74)005-Typical Disabled WC Layout; DT(74)006-G31B - Ground Floor Dry Male Changing Room; DT(74)007-G32/Ground Floor Dry Female Changing Room; DT(74)010-F58 First Floor Male WC Layout; DT(74)011-F47/F48 Wet Change Male/Female Layouts; DT(74)012-F49/F50a Staff Change and Shower Layouts; DT(74)015-S34 Second Floor Female WC Layout; DT(74)016-S57/S89 Second Floor Male/Female WC Layouts; DT(74)017-S44/Second Floor Staff WC Layout NBS Rererenced: K32-Panel Cubicles/Duct and Wall Linings/Screens; N13-Sanitary Appliances and Fittings Schedules: (74)001-Sanitary Schedule 28/06/2011
266ArchitectRoof Openings - Trimmer Positions - Rev A28/06/2011
267ArchitectDT(22)010 Rev B updated to Rev C following BB comments28/06/2011
268ArchitectPL(22)004 updated following BB comments29/06/2011
269ArchitectPL(22)005 Updated following BB comments29/06/2011
270ArchitectPL(22)006 Revised following BB comments.29/06/2011
271ArchitectWork package WP570 for Security Grilles & Screen upload.30/06/2011
272ArchitectWork Package WP410 for Wall pattresses for wall fixed fittings, radiators and teaching wall equipment issue.30/06/2011
273ArchitectExchange Acoustic Wall Panel Setout01/07/2011
274ArchitectFinishes drawings - updated following BB comments04/07/2011
275ArchitectRevised ceiling drawings following BB comments.04/07/2011
276ArchitectNBS Specifications Amended in line with fusion live with RFI comments.08/07/2011
277ArchitectRevised Sanitary Drawings11/07/2011
278ArchitectRevised Slab Edge Drawings13/07/2011
279ArchitectInternal door package updated.14/07/2011
280ArchitectDoor Access drawings and internal door schedules updated to incorporate swipe card access to all stores and risers as instructed by BBCNL 14.07.11.15/07/2011
281ArchitectSlab drawings updated20/07/2011
282ArchitectSketch Section SK01_110721 Section on GL E0421/07/2011
283ArchitectDT(27)009 Updated.21/07/2011
284ArchitectDT(27)011 Uploaded - First Issue22/07/2011
285ArchitectRoof Edge Detail 07 - First Issue22/07/2011
286ArchitectDT(22)031 Fusion Reference Updated27/07/2011
287ArchitectDT(74)017 Fusion Reference updated.27/07/2011
288ArchitectDT(74)014 Fusion Reference updated.27/07/2011
289ArchitectDT(74)002 Fusion reference updated.27/07/2011
290ArchitectDT(74)005 Revised as per BB comments.27/07/2011
291ArchitectDT(30)001 Updated following BB comments.27/07/2011
292ArchitectDT(30)002 Updated following BB comments.27/07/2011
293ArchitectUpload of updated GA plans and Elevations incorporating missing curtain walling references. Upload of TY drawing EL(21)008, Fusion reference NC-TY-21-EL-008_rev-28/07/2011
294ArchitectDT(30)003 Drawing updated following BB comments.28/07/2011
295ArchitectFirst upload of Taylor Young Internal blind strategy drawings - NC-TY-78-0-001, NC-TY-78-1-002, NC-TY-78-2-003 and NC-TY-78-R-004. Update of Taylor Young Window Schedule [NC-TY-31-EL-001], Curtain Walling Schedule [NC-TY-31-SC-006], Internal Screen Schedule [NC-TY-31-X-007], External Door Schedule [NC-TY-32-X-001], Ground Floor Internal Door Schedule [NC-Ty-32-0-002], First Floor Internal Door Schedule [NC-TY-32-1-003], Second Floor Internal Door Schedule [NC-TY-32-2-004]. First upload of NBS Specification N10.240A/B/C.01/08/2011
296ArchitectUpload of Z22 Sealants - First Issue01/08/2011
297ArchitectUpload of updated drawing NC-TY-24-D-004 to incorporate steel beam offsets to ensure a flush finish is achieved within the stair core.01/08/2011
298ArchitectDT(27)013 Sixth Form Deck Parapet Detail - First Issue02/08/2011
299ArchitectRevised roof trimmer / lift drawing showing the Killelea low-level roof queries to the Hall Link area02/08/2011
300ArchitectUpload of Taylor Young drawing PL(24)009 - Fusion Ref: NC-TY-24-D-009 as per BBCNL comments [28/07/11], hellerup stair amended to be parallel to video wall and pocket for screen projector omitted.09/08/2011
301ArchitectUpload of revised glazing specification - L40.370A - to increase laminated glass pane from 6.4mm to 6.8mm to comply with minimum SBD requirements as confirmed by BBCNL.11/08/2011
302Architect'Hidden' Elevations uploaded12/08/2011
303ArchitectFirst upload of Taylor Young drawing NC-TY-24-D-011 Rev-, drawing produced to show stair 11 & 12 single flights.17/08/2011
304ArchitectUpload of revised drawings NC-TY-23-1-002 and NC-TY-23-2-003 to incorporate slab setting out revision to main entrance curtain walling. First upload of Taylor Young drawing NC-TY-20-S-021 showing revised curtain walling setting out to main entrance - GL:B0622/08/2011
305ArchitectUpload of revised drawings NC-TY-52-0-001; NC-TY-52-1-002 and NC-TY-52-2-003 incorporating RWP at grid intersection GL:J03/L02.23/08/2011
306ArchitectUpload of Taylor Young drawing NC-TY-20-0-001-Rev G and NC-TY-20-1-002 Rev G, CP signoff furniture layouts added to drawing. Note - These layouts are out of date as Balfour Beatty are in charge of sub letting FF&E23/08/2011
307ArchitectUpload of revised door access drawings PL(32)001-003 incorporating BBCNL comments regards door opening times, swipe card access requirements and swipe card restrictions/zoning31/08/2011
308ArchitectFirst upload of Taylor Young drawing NC-TY-70-D-002, reception desk option 2 following request from BBCNL to amend design as per discussions with TY/BBCNL/NCS31/08/2011
309ArchitectUpload of revised Taylor Young drawing NC-TY-24-D-005 to revision C status. Offset to beams on GL:H08/N01 and N02 shown following review of Barcon drawing 8853-05.01/09/2011
310ArchitectUpload of revised Taylor Young drawing DT(21)010 incorporating BBCNL comments.01/09/2011
311ArchitectUpload of updated Taylor Young external door schedule, doors DG.Ex.05, DF.209a and DS.36a door types confirmed.01/09/2011
312ArchitectRe-upload of Taylor Young drawings PL(22)007-009, previous issue did not contain a TY ticket number.02/09/2011
313ArchitectFirst upload of Sports Hall cladding drawings NC-TY-22-D-001; NC-TY-22-0-013 and NC-TY-22-EL-001. 05/09/2011
314ArchitectUpload of revised ground floor slab edge details following omission of screed and below dpc block work in lieu of RC upstand. Upload of updated Ground Floor Slab Edge settign out drawing and Below Ground Masonry setting out.09/09/2011
315ArchitectFirst upload of internal signage drawings [ground to second floor inclusive] to fusion for BBCNL comment.12/09/2011
316ArchitectUpload of revised ground floor finishes plan incorporating BBCNL comments.12/09/2011
317ArchitectFirst upload of Taylor Young Access control drawings PL(68)001-003, drawings reflect BBCNL issued information. 12/09/2011
318ArchitectUpload of Taylor Young drawings PL(42)001-003 and first upload of Taylor Young drawing EL(42)001. Drawings incorporate BBCNL comments received 12.09.1113/09/2011
319ArchitectSports Hall Maintenance Strategy - First Issue14/09/2011
320ArchitectUpload of Taylor Young drawings PL(22)004, EL(21)006, EL(21)009, EL(21)010 and DT(32)001 to Fusion to reflect comments made at commercial meeting 05/09/11 and 06/09/11.14/09/2011
321ArchitectASD - Draft Revised Proposals15/09/2011
322ArchitectStore under Stair 07 - sketch section19/09/2011
323ArchitectFirst upload of maintenance access drawing, drawing created following receipt of BBCNL sketch illustrating reduced maintenance access zones. 22/09/2011
324ArchitectRevised Details to existing & new-build interface following CC TY11822/09/2011
325ArchitectGround Floor Slab with kitchen penetrations added22/09/2011
326ArchitectDrawings Issued For Construction26/09/2011
327ArchitectGround Floor Penetrations updated.28/09/2011
328ArchitectSecond Floor Ceiling Plan with Exchange Ventilation added29/09/2011
329ArchitectUpload of revised drawing EL(42)001 following Plincke input into external signage proposals.03/10/2011
330ArchitectDigital signage added to Internal Signage Layouts05/10/2011
331ArchitectUpload of revised specification P10/258 following omission of screed and underfloor heating to ground floor slab.05/10/2011
332ArchitectRevised GA's and slab drawings 06/10/2011
333ArchitectDrinking fountains updated06/10/2011
334ArchitectRevised Slab Edge Drawings10/10/2011
335ArchitectAnalysis Of Changes To ARUP Fire Strategy Report11/10/2011
336ArchitectDT(27)001 updated - north height window heights equalised in elevation13/10/2011
337ArchitectRevised Ground Floor Slab14/10/2011
338ArchitectAdditional Store Under Hellerup18/10/2011
339ArchitectUpload of revised Balustrade package in accordance with BBCNL comments.18/10/2011
340ArchitectUpload of revised screen drawings following review of clashes with fixed furniture. Screen elevation types 2 and 3 added to TY drawing SC(31)00725/10/2011
341ArchitectRECORD drawings for Sports Hall refurbishment.25/10/2011
342ArchitectUpload of revised first and second floor slab setting out plan.26/10/2011
343ArchitectUpload of Sports Hall Finishes drawing revised to reflect BBCNL regards works to megadeco painted downstands.27/10/2011
344ArchitectUpload of Taylor Young drawing PL(23)001 - NC-TY-23-0-001; incorporating below slab floor safe, safe positioned as per BBCNL sketch NC_BB_SK_01002/11/2011
345ArchitectUpload of new drawing DT(74)020 - NC-TY-74-D-020: Hygiene room layout02/11/2011
346ArchitectVent Analysis To Existing 2 Storey Core Block03/11/2011
347ArchitectDiesel Pump Flue / Air Intake drawing issued04/11/2011
348ArchitectUpload of revised partition specification K10.115A to reflect correct stud section reference.10/11/2011
349ArchitectGround Floor Internal Drylining updated10/11/2011
350ArchitectUpload of Record Residual risk register for Sports Hall.11/11/2011
351ArchitectGround Floor Brickwork / Blockwork - dimensions updated16/11/2011
352ArchitectDT(20)001 Issued for Consrtuction16/11/2011
353ArchitectPL(21)001,PL(21)002,PL(21)003 Issued for Construction16/11/2011
354ArchitectElevation brick window head heights updated21/11/2011
355ArchitectRevised Slab Edge Drawings21/11/2011
356ArchitectUpload of revised internal door schedule to reflect comments received from BBCNL. Dwg reference: BBCNL Mark Up/Comments on internal door schedule 28/10/11.23/11/2011
357ArchitectUpload of revised internal door schedules and additional NBS L20 specification for FR60 non acoustic doorsets.24/11/2011
358ArchitectUpload of drawings NC-TY-32-0-001/002/003 to construction status drawings.24/11/2011
359ArchitectUpload of Taylor Young drawing DT(27)002 and SC(31)004 following instruction to relocate north light windows WR.09/10.24/11/2011
360ArchitectUpload of revised internal door schedule incorporating new door specifications L20.480F and L20.480G. Door closser added to all fire rated and swipe access control doors.28/11/2011
361ArchitectPL(21)001 Revised30/11/2011
362ArchitectUpload of revised reception desk drawing DT(70)001 following Client change request (BBCNL/NC School).01/12/2011
363ArchitectUpload of revised drawing NC-TY-23-2-004 incorporating setting out for RW outlets06/12/2011
364ArchitectUpload of revised drawing NC-TY-22-0-004; drawing updated to reflect slab edge detail 17 on drawing NC-TY-22-D-005-Rev B.06/12/2011
365ArchitectUpload of Taylor Young drawing PL(22)007 and PL(22)008 - additional setting out information added.07/12/2011
366ArchitectThe following drawings/specifications have been uploaded as Construction Status drawings: NC-TY-23-0-006; NC-TY-23-0-005; NC-TY-21-EL-010; NC-TY-22-1-005; NC-TY-22-2-006; NC-TY-21-EL-008 and NC-TY-SP-P10.07/12/2011
367ArchitectANC's 1,5,9,10,11,12 & 14 implemented08/12/2011
368ArchitectBrick support heights adjusted to suit Killelea RHS heights09/12/2011
369ArchitectPL(21)001 Movement joint position updated following WML comments.12/12/2011
370ArchitectExternal masonry amended in plan behind cladding14/12/2011
371ArchitectFurther drawings issued as a result of the implementation of ANC 1,5,9,10,11,12 & 1414/12/2011
372ArchitectEWS Curtain Walling Comments - Sports Hall Link15/12/2011
373ArchitectUpload of TY drawing DT(27)002 with additional setting out information as requested by Unique Roofing Ltd.15/12/2011
374ArchitectFurther ANC 1,5,9,10,11,12 & 14 issue19/12/2011
375ArchitectFinishes drawings updated - ANC 1819/12/2011
376ArchitectUpload of revised drawing NC-TY-27-R-001 incorporating additional setting out positions and new rain water outlets.21/12/2011
377ArchitectFurther dims added to ground floor external brickwork / blockwork03/01/2012
378ArchitectUpload of revised Taylor Young drawing NC-TY-27-R-001 incorporating BBCNL comments, additional setting out information and BBES SVP locations.03/01/2012
379ArchitectCW.F.207.a - Additional Details04/01/2012
380ArchitectFirst upload of Taylor Young drawing DT(27)015 - Roof Access Hatch - Typical detail.04/01/2012
381ArchitectUpload of revised ground floor fire plan (PL(22)001) incorporating setting out information for vertical cavity fire barriers.05/01/2012
382ArchitectFirst upload and issue of drawings DT(20)002, DT(20)003; upload of revised Ground Floor GA PL(20)001 incorporating above drawing references. 06/01/2012
383ArchitectCW.F.35 (rear of Core) cill raised06/01/2012
384ArchitectFront of S Block Cladding Details09/01/2012
385ArchitectUpload of Ground/First and Second Floor GA's incorporating Deanestor information.09/01/2012
386ArchitectUpload of revised Roof opening drawing PL(27)002 incorporating revised roof access hatch locations.10/01/2012
387ArchitectFirst upload of TY drawing PL(27)003 illustrating roof access barrier zones; overlay of BBES Roof Vent Model to demonstrate roof duct/plant locations.10/01/2012
388ArchitectUpload of loaded sanitary GA drawings - PL(74)001 to PL(74)003 following BBES request.10/01/2012
389ArchitectDrawings updated for second floor external deck ramp TY 126 11/01/2012
390ArchitectGeneral Arrangement Plans (Ground to Second)updated to incorporate Deanestor furniture proposals.11/01/2012
391ArchitectRevised Grid - ASD12/01/2012
392ArchitectUpload of TY drawings SC(31)004; DT(27)001 and DT(27)002 incorporating reduced window head height of 900mm.12/01/2012
393ArchitectDT(27)009 amended.12/01/2012
394Architect110915_SK01 Further dims added12/01/2012
395ArchitectUpload of TY drawings PL(74)001, PL(74)003 and DT(74)015 incorporating hygiene room at GF and revised second floor S34 layout (ANC TY 126)12/01/2012
396ArchitectUpload of revised sanitary drawings in accordance with BBCNL Tiling Package TQ's document. 16/01/2012
397ArchitectUpload of revised GA plans (20 series)incorporatinig sanitary, ff&e and catering overlay information as requested by BBES.17/01/2012
398ArchitectPL(22)009 Further dims added.18/01/2012
399ArchitectStair 03 Plinth Detail18/01/2012
400ArchitectPL(35)002 Ceiling amended to Exchange walkway19/01/2012
401ArchitectRefurb First & Second Floor GA's issued.20/01/2012
402ArchitectEL(21)001 updated with existing fascia20/01/2012
403ArchitectDT(27)003 Isued as Construction.23/01/2012
404ArchitectDT(21)011 Issued for Construction.23/01/2012
405ArchitectDT(21)009 Issued for Construction.23/01/2012
406ArchitectDT(21)008 Issued for Construction.23/01/2012
407ArchitectDT(21)007 Issued for Construction.23/01/2012
408ArchitectDT(21)003 Issued for Construction.23/01/2012
409ArchitectDT(21)002 Issued for Construction.23/01/2012
410ArchitectDT(21)001 Issued for Construction.23/01/2012
411ArchitectEL(21)002 Issued for Construction.23/01/2012
412ArchitectEL(21)004 Issued for Construction.23/01/2012
413ArchitectDT(30)002 Issued for Construction.23/01/2012
414ArchitectDT(30)001 Issued for Construction.23/01/2012
415ArchitectSE(27)001 Issued for Construction.23/01/2012
416ArchitectDT(27)002 Issued for Construction.24/01/2012
417ArchitectDT(27)001 Issued for Construction.24/01/2012
418ArchitectDT(27)009 Issued for Construction.24/01/2012
419ArchitectDT(27)012 Issued for Construction.24/01/2012
420ArchitectDT(27)011 Issued for Construction.24/01/2012
421ArchitectPL(27)001 Issued for Construction.24/01/2012
422ArchitectPL(27)002 Issued for Construction.24/01/2012
423ArchitectUpload of revised door schedule incorporating host wall thickness dimensions.24/01/2012
424ArchitectDT(27)007 Issued for Construction.24/01/2012
425ArchitectDT(27)006 Issued for Construction.24/01/2012
426ArchitectNBS P10 Issued as Construction.24/01/2012
427ArchitectDT(22)003 Issued for Construction.24/01/2012
428ArchitectDT(22)005 Issued as Construction.24/01/2012
429ArchitectPL(24)011 Issued for Construction.24/01/2012
430ArchitectEL(31)025 Issued for Construction.24/01/2012
431ArchitectEL(31)024 Issued for Construction.24/01/2012
432ArchitectEL(31)023 Issued for Construction.24/01/2012
433ArchitectWindow Schedule & Types Drawing Updated.24/01/2012
434ArchitectDT(31)008 Issued for Construction.25/01/2012
435ArchitectDT(21)006 Issued for Construction.25/01/2012
436ArchitectUpload of GA plans (Ground to Second) incorporating FF&E layouts25/01/2012
437ArchitectEL(21)006 Issued for Construction.25/01/2012
438ArchitectRevised Grid Setting Out.25/01/2012
439ArchitectDT(27)016 ASD / Existing Parapet Upstand Detail26/01/2012
440ArchitectPL(27)001 Roof Plan revised.26/01/2012
441ArchitectPL(21)002 First Floor external Masonry updated around Stair 02.27/01/2012
442ArchitectUpdated NBS Issue - Sections - K40/ M50/ Z20/ M20/ M60/ N10 & P20 (To satisfy BREEAM requirements)30/01/2012
443ArchitectUpload of revised fire drawings incorporating requirements of ARUP Stage E Fire report.31/01/2012
444ArchitectUpload of revised internal door schedules incorporataing additional doors required to comply with ARUP Stage E Fire Report31/01/2012
445ArchitectUpload of generic fitting heights drawing and revised drawing SE(22)001. 01/02/2012
446ArchitectUpload of revised drawing DT(22)010 incorporating masonry wall fire head detail.02/02/2012
447ArchitectDrawing DT(21)002 updated to incorporate horizontal fire cavity barrier in accordance with ARUP Fire Stage E report. NBS Specification P12/110A added with associated product reference. 03/02/2012
448ArchitectRevit Model Issue dwg03/02/2012
449ArchitectSC(31)006 revised - CW.F.40 width amended and new pass door added in line with ARUP Fire Stage E Report.03/02/2012
450ArchitectNew drawing upload. DT(20)022 uploaded following request by EWS Sub contractor.03/02/2012
451ArchitectDining To Exchange Glazing Section Sketch issued.06/02/2012
452ArchitectDT(20)022 Exchange Curtain Walling Sections - additional section added07/02/2012
453ArchitectRevised ceilings plans in line with BBES comments regards ceiling grid setting out.07/02/2012
454ArchitectExchange glazed screens detailed07/02/2012
455ArchitectUpload of revised ground / first floor internal door schedules; NBS specification correction for doors: DG17/DG40/DG210/DF04/DF34/DF58/DF203.08/02/2012
456ArchitectAnalysis Of Implications Of M&E Proposed Ceiling Drops08/02/2012
457ArchitectPL(20)002 Updated.08/02/2012
458ArchitectInner glazed acoustic screen added to Exchange wall of G61 Music Class08/02/2012
459ArchitectUpdated External Elevations & Roof Plan for Planning08/02/2012
460ArchitectUpdated NBS M60 Painting / Clear Finishing (Construction Issue)09/02/2012
461ArchitectExtra lobby / Glazed screens to Stair 0709/02/2012
462ArchitectPL(20)001 amended09/02/2012
463ArchitectPL(20)001 re-issued.09/02/2012
464ArchitectColoured Teaching Walls Added to Finishes Drawings09/02/2012
465ArchitectUpdated NBS N13 Sanitary Fittings13/02/2012
466ArchitectUpdated NBS M50 Floor Coverings13/02/2012
467ArchitectUpload of revised drawing EL(21)009 incorporating additional setting out dimensions to detail elevation 02.13/02/2012
468ArchitectUpload of revised internal screen schedule incorporating screen type 3 elevation and screen head type 6 details.13/02/2012
469ArchitectUpload of new drawing - DT(24)002 Typical Stair Nosing detail.13/02/2012
470ArchitectUpload of new TY drarwing DT(34)005 - Sports Link Balustrade detail.15/02/2012
471ArchitectUpload of revised drawing NC-TY-21-D-002 detail 9 incorporating window board to cover EWS fixing bracket.15/02/2012
472ArchitectRevised drawing DT(34)003 uploaded incorporating mdf stringer to stair flight and landings.16/02/2012
473ArchitectUpload of planning elevation drawings in colour - no further revisions made to the drawing.20/02/2012
474ArchitectReport (a) Current Status of M&E Roof Plant as at 22/02/1224/02/2012
475ArchitectRoof GA with indicative plant screen positions added.24/02/2012
476ArchitectSecond Floor Brickwork Setting-out To GL B01 120227_SK0127/02/2012
477ArchitectUpload of revised TY drawings EL(21)009;EL(31)022; EL(31)024; PL(23)002; PL(35)002; PL(35)00327/02/2012
478ArchitectGround Floor Reflected Ceiling updated to Kitchen area29/02/2012
479ArchitectDT(74)017 Issued for Construction.29/02/2012
480ArchitectDT(74)016 Issued for Construction.29/02/2012
481ArchitectDT(74)011 Issued for Construction.29/02/2012
482ArchitectDT(74)010 Issued for Construction.29/02/2012
483ArchitectDT(74)009 Issued for Constructio29/02/2012
484ArchitectDT(74)008 Issued for Construction.29/02/2012
485ArchitectDT(74)006 Issued for Construction.29/02/2012
486ArchitectDT(74)005 Issued for Construction.29/02/2012
487ArchitectPL(35)001 Ceiling height amended to G68e29/02/2012
488ArchitectDT(74)015 Issued for Construction.29/02/2012
489ArchitectUpload of revised TY drarwings: SC(31)005; SC(31)006; PL(78)001 - 004 following BBCNL amendments to blind strategy.01/03/2012
490ArchitectPL(74)001 Issued for Construction.01/03/2012
491ArchitectPL(74)003 Issued for Construction.01/03/2012
492ArchitectSC(31)004 Drawing issued for Construction.01/03/2012
493ArchitectRevised Fire drawings following review of illuminated and non illuminated signage - for BBCNL comment.01/03/2012
494ArchitectPL(74)002 Issued for Construction.01/03/2012
495ArchitectEL(31)022 Issued for Construction.02/03/2012
496ArchitectEL(21)001 Issued for Construction.02/03/2012
497ArchitectEL(21)003 Issued for Construction.02/03/2012
498ArchitectDT(20)021 Issued for Construction.02/03/2012
499ArchitectDT(20)020 Issued for Construction.02/03/2012
500ArchitectDT(27)015 Issued for Construction.02/03/2012
501ArchitectPL(23)002 Issued for Construction.02/03/2012
502ArchitectUpload of revised internal signage drawings following BBCNL/NCHS review.02/03/2012
503ArchitectDT(22)010 Issued for Construction.05/03/2012
504ArchitectDT(27)016 Fusion Reference updated.05/03/2012
505ArchitectSC(31)003 Issued for Construction.05/03/2012
506ArchitectDT(27)013 Amended to brick dims.06/03/2012
507ArchitectEL(31)025 Ramp omitted, door thresholds lowered (subject to Building Control Approval) and screen CW.S.33 opening size amended to suit brick dims to pier at GL F02.06/03/2012
508ArchitectDT(30)003 Issued for construction.06/03/2012
509ArchitectDT(27)008 Issued for Construction.06/03/2012
510ArchitectDT(34)003 Issued for Construction.07/03/2012
511ArchitectDT(34)005 issued for Construction.07/03/2012
512ArchitectDT(27)013 Issued for Construction.07/03/2012
513ArchitectUpload of revised stair 08 - PL(24)008 - sports link incorporating additional flight; upload of PL(20)002 incorporating WML GL's.07/03/2012
514ArchitectEL(21)007 Issued for Construction.07/03/2012
515ArchitectPL(22)004 Issued for Construction.07/03/2012
516ArchitectEL(21)009 Issued for Construction.07/03/2012
517ArchitectEL(21)012 Issued for Construction.08/03/2012
518ArchitectPL(22)004 Detail extended.08/03/2012
519ArchitectDiscovery Lounge Perspective09/03/2012
520ArchitectDT(22)004 Issued for Construction.09/03/2012
521ArchitectUpload of revised NBS Specification L10/330 to include 100mm restrictor note.09/03/2012
522ArchitectPL(24)002 Issued for Construction.09/03/2012
523ArchitectRevised Taylor Young drawing incorporating 150mm tiled splash back zone.12/03/2012
524ArchitectRoof Plant Eye-level Views14/03/2012
525ArchitectRefurb Presentation21/03/2012
526ArchitectParapet Wall Detail DT(20)025 First Issue22/03/2012
527ArchitectDT(20)026 Indicative Internal Screen To Column Connection Detail22/03/2012
528ArchitectPL(20)000b updated, re-numbered as PL(27)003 & re-issued.30/03/2012
529Architect120330 SK01 Riser 3 Second Floor Slab Investigation30/03/2012
530ArchitectDT(35)002 Sixth Form Ceiling Details02/04/2012
531ArchitectDT(35)003 Rooflight 01 Bulkhead Detail02/04/2012
532ArchitectDT(35)004 Creative Northlight Ceiling Bulkhead Detail03/04/2012
533ArchitectDT(27)001 North Light Detail updated03/04/2012
534ArchitectDT(35)005 Bulkhead Detail At Head Of Stair 0103/04/2012
535ArchitectSC(31)007 Further details added.04/04/2012
536ArchitectEL(22)010 Fire Barriers To Elevations04/04/2012
537ArchitectDT(20)027 Screen To Dining Circular Column Detail17/04/2012
538ArchitectDT(20)028 Indicative Screen To Circular Column Connection Detail17/04/2012
539ArchitectUpload of revised Curtain Walling (SC(31)006 and SC(31)007) and Screen schedules incorporating barrier loading requirements.19/04/2012
540ArchitectUpload of new drawing EL(22)011 - Opera Feature wall setting out following request for information from BBCNL.20/04/2012
541ArchitectDT(35)006 Creative Void Bulkhead Detail23/04/2012
542ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out24/04/2012
543ArchitectSE(20)022 Office G25 / F44 Seminar Room Long Section30/04/2012
544ArchitectUpload of revised Discovery Lounge Perspective incorporating revised exposed ductwork.01/05/2012
545ArchitectDT(31)001 Curtain Walling / Hall Ramp Interface Detail01/05/2012
546ArchitectEL(21)003 Elevation 03 - South West / South East Facing Elevation Issued02/05/2012
547ArchitectEL(21)009 'Hidden' Elevations - Sheet 01 Issued.02/05/2012
548ArchitectSC(31)003 Window Types Issued02/05/2012
549ArchitectSC(31)005 Window Schedule Issued.02/05/2012
550ArchitectPL(20)001 General Arrangement Ground Floor Plan Issued02/05/2012
551ArchitectUpload of revised internal signage drawings (ground to second) in accordance with BBCNL comments (29.03.12).02/05/2012
552ArchitectUpload of revised second floor blind drawing PL(78)003 incorporating BBCNL comments.02/05/2012
553ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out Issued02/05/2012
554ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out Issued02/05/2012
555ArchitectPL(35)003 Second Floor Reflected Ceiling Plan Issued02/05/2012
556ArchitectUpload of revised external door schedule SC(32)001; amendments made to pull/lever handles03/05/2012
557ArchitectUpload of revised finishes plans PL(40)001-003 incorporating amended in line with BBCNL flooring specification 19/04/12 and revised to BBCNL flooring specification 04/05/12. 08/05/2012
558ArchitectUpload of revised PL(40)001-003 drawings; Item 2c corrected on the key to read Polysafe Corona. Revised NBS M50 incorporating specification change in line with BBCNL floor specification document dated 04/05/12. 08/05/2012
559ArchitectUpload of Taylor Young drawing PL(20)002 re-instating screen SC.F.13 that had been corrupted within the Re-Vit model. 09/05/2012
560ArchitectEL(40)001 Exchange Acoustic Wall Panel Setout Issued09/05/2012
561ArchitectUpload of revised blind strategy drawings PL(78)001-004 in line with BBCNL comments received via email 10/05/2012.10/05/2012
562ArchitectUpload of revised NBS Specification N10 including colour references for internal blinds.11/05/2012
563ArchitectUpload of revised drawing SE(20)022 incorporating confirmed steel dimensions received from BBCNL 11/05/12. 11/05/2012
564ArchitectUpload of amended Discovery Lounge Perspective incorporating revised exposed ductwork received from BBES 08/05/1211/05/2012
565ArchitectUpload of revised TY drawings PL(35)001-003 and PL(40)001-003; refelcted ceiling plans and finishes plans incorporating BBCNL revised ceiling specification; TY NBS K40 also updated. Drawings updated to include plasterboard above WC's as BBCNL approved RDD submission. 15/05/2012
566ArchitectUpload of revised door schedule incorporating EWS typical door specification and BBCNL revised access control requirements.17/05/2012
567ArchitectSE(20)023 Seminar Room Short Section issued18/05/2012
568ArchitectSE(20)022 updated18/05/2012
569ArchitectSE(20)022 Office G25 / F44 Seminar Room Long-Section updated.23/05/2012
570Architect120528_SK01 View to Sports (with screens) - First Issue (additional view)28/05/2012
571ArchitectTaylor Young drawings PL(32)001 to 003 and door schedules SC(32)002-004 updated to reflect revised BBCNL/BBES door access control requirements.28/05/2012
572ArchitectUpload of revised internal door schedule incorporating omission of door closers to cleaners and riser doors.28/05/2012
573ArchitectPL(20)002 General Arrangement First Floor Plan Revised.29/05/2012
574ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.29/05/2012
575ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out updated.29/05/2012
576ArchitectPL(40)002 First Floor Finishes Plan updated.29/05/2012
577ArchitectDT(74)012 F49/F50A First Floor Staff Change and Shower Layouts updated.29/05/2012
578ArchitectPL(74)002 First Floor Sanitary Locations updated.29/05/2012
579ArchitectDrawing PL(35)003 Second Floor Reflected Ceiling Plan updated.29/05/2012
580ArchitectSE(20)021 Main Entrance Curtain Walling along Grid Line B.06 between Grid Line A.08 and A.09 updated.31/05/2012
581ArchitectDT(20)029 Section Through Dining Entrance / Dropped Bulkhead issued.31/05/2012
582ArchitectUpload of sketch drawing 120607_SK01 illustrating Sports Hall entrance without screening - drawing requested by M.R.(BBCNL).07/06/2012
583ArchitectUpload of revised drawing PL(27)016 - Roof Edge Protection / Access Barriers to incorporate indicative raised access platforms to AHU's. Drawing updated in accordance with BBCNL (SL) site meeting with BBES.07/06/2012
584ArchitectUpload of Taylor Young feasibility sketch demonstrating restricted space within north light for secondary means of escape.07/06/2012
585ArchitectUpload of Taylor Young sketch 4858_120611_SK01 illustating roof escape distances. 11/06/2012
586ArchitectUpload of revised Taylor Young drawing NC-TY-22-0-007; Ground floor internal drylining setting out.11/06/2012
587ArchitectUpload of Taylor Young sketch drawing 4858_120611_SK02 indicating locations of AA720 doors.11/06/2012
588ArchitectExtract of Taylor Young drawing NC-TY-22-1-002 to illustrate primary and secondary egress routes to rooms F35 to F42.12/06/2012
589ArchitectTY drawing PL(34)003 updated to incorporate wall mounted handrail to ramps.12/06/2012
590ArchitectUpload of revised Taylor Young drawing DT(27)013 incorporating door threshold detail.14/06/2012
591ArchitectEL(31)025 Curtain Wall - Exchange Elevation Sheet 2 updated.14/06/2012
592ArchitectDT(20)023 Section Through Exchange Screen Curtain Walling at Floor Interface issued.14/06/2012
593ArchitectUpload of Taylor Young revised drawing PL(24)002 incorporating wall mounted handrail and centralised mid rail.14/06/2012
594ArchitectDT(20)031 Proposed Hellerup Projector Housing issued.14/06/2012
595ArchitectUpload of revised Taylor Young external door schedule SC(32)001 omitting door type A770 in lieu of door type 190 as per BBCNL (KH) instruction 14/06/12.14/06/2012
596ArchitectPL(22)009 Updated.14/06/2012
597ArchitectUpload of revised ground floor door schedule incorporating ironmongery requirements to door DG.68G.b15/06/2012
598ArchitectUpload of revised ceiling plans incorporating changes to ceiling heights as per BBCNL approved drawing NC-BB-SK-08415/06/2012
599ArchitectPL(22)008 Issued for construction.15/06/2012
600ArchitectPL(22)007 Issued for Construction.15/06/2012
601ArchitectPL(22)008 Issued.15/06/2012
602ArchitectPL(20)002 Issued.15/06/2012
603ArchitectDT(74)012 Issued.15/06/2012
604ArchitectUpload of revised Taylor Young drawings EL(31)023, SC(31)003 and 005 incorporating revised ASD window following incorporation of structural stability frame.18/06/2012
605ArchitectUpload of revised Taylor Young drawing PL(27)016 incorporating relocated roof access hatch to bottom of S-Block; addition of egress escape distances and addition of indicative roof step over image.19/06/2012
606ArchitectUpload of Taylor Young drawing DT(35)006 and PL(35)003 incorporating typical slab edge detail and setting out of mf boarding to exchange space.19/06/2012
607ArchitectDT(35)007 Issued.19/06/2012
608ArchitectUpload of revised drawing PL(20)002 incorporating offset door to screen SC.F.203 and curtain walling CWF.203 - doors sizes to these screens have not been changed.20/06/2012
609ArchitectUpload of new Taylor Young drawings SE(20)010 - Manintenance Access Sections and PL(27)020 - Maintenance Access Strategy Plans and Maintenance and Access Strategy document.21/06/2012
610ArchitectUpload of sketch detail through jumbo stud wall showing window head/cill detail.21/06/2012
611ArchitectDT(24)002 Stair 14 (step-over-bund) Detail issued.21/06/2012
612ArchitectPL(23)003 Issued for Construction.21/06/2012
613ArchitectSixth Form Fire Consultant Revised Escape Proposal22/06/2012
614ArchitectUpload of additional 8No. sections through dining void as per BBCNL request 06.06.12.22/06/2012
615ArchitectUpload of drawing PL(20)002. Missing information from Dwg file corrected. No changes to drawn information.25/06/2012
616ArchitectPL(20)005 G.I.F.A. Plan issued.25/06/2012
617ArchitectUpload of revised drawing PL(52)001 incorporating rear of S-Block surface drainage locations.26/06/2012
618ArchitectUpload of new Taylor Young detail - DT(21)013; Trespa/Curtain walling abutment detail at the main entrance.26/06/2012
619ArchitectUpload of new drawing DT(21)014; F.19 Screen / Ramp Abutment details.27/06/2012
620ArchitectUpload of revised Taylor Young drawing PL(20)002 - First Floor GA; PL(22)002 - First Floor Fire Plan and SC(31)007 - Screen schedule.27/06/2012
621ArchitectUpload of revised Taylor Young drawing SC(32)005 incorporating dimensions for Internal Door Type 09.02/07/2012
622ArchitectUpload of Taylor Young drawing SE(20)021 incorporating additional notes to curtain walling head detail.02/07/2012
623ArchitectUpload of new Taylor Young drawing DT(21)015 - Curtain Walling / Metal Cladding abutment detail.02/07/2012
624ArchitectUpload of revised Taylor Young drawing PL(27)002 - Roof Openings - Trimmer Positions, incorporating roof access hatch above ICT Store.03/07/2012
625ArchitectUpload of revised door schedules incorporating door stop locations. SC(32)001 to SC(32)005.04/07/2012
626ArchitectEL(21)006 Elevation 06 - A.S.D. Unit issued.04/07/2012
627ArchitectUpload of new Taylor Young drawing DT(27)017: Roof Edge detail along GL:G05.05/07/2012
628ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings issued.06/07/2012
629ArchitectUpload of revised reception desk drawing incorporating 1500mm clear worktop.06/07/2012
630ArchitectSE(20)024 ASD Section issued.06/07/2012
631ArchitectUpload of drawing DT(24)003 - Ramp section / details to Staff room. First Issue.06/07/2012
632ArchitectSE(20)024 ASD Section Issued.09/07/2012
633ArchitectDT(35)007 Indicative Steel Detail Above Moveable Walls issued for Construction.09/07/2012
634ArchitectDT(35)006 Creative Void Bulkhead Detail issued for Construction.09/07/2012
635ArchitectPL(27)016 Roof Edge Protection / Access Barriers issued for Construction.09/07/2012
636ArchitectSC(31)005 Window Schedule isued for Construction.09/07/2012
637ArchitectEL(31)023 Curtain Wall - Inclusion/Courtyard issued.09/07/2012
638ArchitectSC(31)006 Curtain Walling Schedules issued for Construction.09/07/2012
639ArchitectPL(40)001 Ground Floor Finishes Plan issued for construction.09/07/2012
640ArchitectPL(40)002 First Floor Finishes Plan issued for Construction.09/07/2012
641ArchitectPL(40)003 Second Floor Finishes Plan issued for Construction.09/07/2012
642ArchitectPL(78)001 Ground Floor - Blind Strategy issued for Construction.09/07/2012
643ArchitectPL(78)002 First Floor - Blind Strategy issued for Construction.09/07/2012
644ArchitectPL(78)003 Second Floor - Blind Strategy issued for Construction.09/07/2012
645ArchitectPL(78)004 Roof Lights - Blind Strategy issued for Construction.09/07/2012
646ArchitectEL(40)001 Exchange Acoustic Wall Panel Setout issued for Construction.09/07/2012
647ArchitectPL(40)001 Ground Floor Finishes Plan10/07/2012
648ArchitectUpload of new drawing DT(35)008, Typical Screen Head Detail Along GL:H01 and E01. First Issue.11/07/2012
649ArchitectUpload of drawings PL(20)001; PL(27)001; PL(35)001; SC(31)006 and DT(35)008 following BBCNL request for incorporation of new screen about GL:H01 and omission of Roof ligths No. 29/30.11/07/2012
650ArchitectPL(20)002 General Arrangement First Floor Plan updated.11/07/2012
651ArchitectPL(22)008 First Floor Internal Drylining Setting Out issued.11/07/2012
652ArchitectPL(40)002 First Floor Finishes Plan updated.11/07/2012
653ArchitectPL(40)001 Ground Floor Finishes Plan issued.11/07/2012
654ArchitectSE(20)011 Additional Sections through Dining Void issued.11/07/2012
655ArchitectUpload of Planning S73 application drawings.13/07/2012
656ArchitectDT(20)031 Proposed Hellerup Projector Housing issued.16/07/2012
657ArchitectSC(32)003 Internal Door Schedule - First Floor updated.16/07/2012
658ArchitectPL(20)001 General Arrangement Ground Floor Plan issued.16/07/2012
659ArchitectSC(31)007 Screen Schedule issued.16/07/2012
660ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out issued.16/07/2012
661ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out issued.16/07/2012
662ArchitectEL(21)006 Elevation 06 - A.S.D. Unit issued.16/07/2012
663ArchitectUpload of new Taylor Young drawing DT(20)032; Secondary Means of Escape from Sixth Form. First Issue.16/07/2012
664ArchitectUpload of revised external door schedule SC(32)001 incorporating new external door DS.54.16/07/2012
665ArchitectUpload of revised drawing EL(31)024 incorporating revised setting out of screen CW.S.52.a16/07/2012
666ArchitectSC(31)007 Screen Schedule updated.16/07/2012
667ArchitectPL(27)001 Roof General Arrangement issued16/07/2012
668Architect4858_DT(27)018 Rooflight 13 Louvre Zone issued.16/07/2012
669ArchitectUpload of revised Maintenance Strategy for High Level Access incorporating CDM-C's comments received 06th July 2012.17/07/2012
670ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.17/07/2012
671ArchitectUpload of revised finishes drawing incorporating minor amendments to accord with TY comments issued 15/05/12.17/07/2012
672ArchitectDT(20)031 Proposed Hellerup Projector Housing issued for Construction.17/07/2012
673ArchitectPL(40)002 First Floor Finishes Plan issued.17/07/2012
674ArchitectUpload of revised second floor GA PL(20)003 incorporating revised sixth form secondary means of escape.17/07/2012
675ArchitectUpload of specifications L30 and N10 to construction status.18/07/2012
676ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out issued.18/07/2012
677ArchitectSC(31)007 Screen Schedule issued.18/07/2012
678ArchitectUpload of NBS specification M50 to Construction status.18/07/2012
679ArchitectDT(35)008 Typical Screen Head Detail Along GL.H01 and E.05 issued for Construction.18/07/2012
680ArchitectUpload of revised NBS Spec M60 in line with BBCNL comments.18/07/2012
681ArchitectUpload of NBS P20 incorporating BBCNL comments.18/07/2012
682ArchitectDT(70)001 Proposed Reception Desk issued for Construction.18/07/2012
683ArchitectDT(27)017 Roof Edge Detail Along GL.G05 issued for Construction.18/07/2012
684ArchitectSC(32)002 Internal Door Schedule - Ground Floor issued.18/07/2012
685ArchitectSC(32)003 Internal Door Schedule - First Floor issued.18/07/2012
686ArchitectSC(32)004 Internal Door Schedule - Second Floor issued for Construction.18/07/2012
687ArchitectSC(32)005 Internal Door Legend and Typical Details issued for Construction.18/07/2012
688ArchitectDT(21)015 Curtain Walling to Metal Cladding Abutment Detail issued for Construction.18/07/2012
689ArchitectSE(20)021 Main Entrance Curtain Walling along Grid Line B.06 between Grid Line A.08 and A.09 issued for Construction.18/07/2012
690ArchitectDT(21)013 Trespa / Curtain Walling Abutment Detail - Main Entrance issued for Construction.18/07/2012
691ArchitectPL(52)001 Ground Floor Rainwater Penetration Setting Out issued for Construction.18/07/2012
692ArchitectPL(27)001 Roof General Arrangement issued.18/07/2012
693ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out issued.18/07/2012
694ArchitectPL(27)020 Maintenance Access Strategy Plans issued for Construction.19/07/2012
695ArchitectPL(35)003 Second Floor Reflected Ceiling Plan issued for Construction.19/07/2012
696ArchitectUpload of revised NBS Spec N10.240A incorporating statement regards electric operation to roof blinds.19/07/2012
697ArchitectUplift of drawing DT(24)003 to construction status.19/07/2012
698ArchitectUplift of drawing DT(21)014 to construction status.19/07/2012
699ArchitectEL(22)011 Opera Feature Wall issued for Construction.19/07/2012
700ArchitectDT(31)001 Curtain Walling / Hall Ramp Interface Detail issued for Construction.19/07/2012
701ArchitectEL(31)025 Curtain Wall - Exchange Elevation Sheet 2 issued.19/07/2012
702ArchitectEL(21)009 'Hidden' Elevations - Sheet 01 issued.19/07/2012
703ArchitectDT(20)028 Indicative Screen To Circular Column Connection Detail issued for Construction.19/07/2012
704ArchitectUpload of revised drawing PL(20)001 and EL(31)024 incorporating revised setting out for screen CW.G.213 following relocation of internal door D.G.20720/07/2012
705ArchitectEL(22)010 Fire Barriers To Elevations issued for Construction.23/07/2012
706ArchitectDT(20)027 Screen To Column Detail At H01 / B07 issued for Construction.23/07/2012
707ArchitectDT(20)025 Parapet Wall Detail To GL H08 issued for Construction.23/07/2012
708ArchitectUpload of revised drawing EL(31)024 incorporating sub contractor design element to screens CW.S.201, CW.F.10a and CW.G.80a23/07/2012
709ArchitectDT(24)020 Typical Stair Nosing Detail issued.23/07/2012
710ArchitectDT(27)018 Rooflight 13 Louvre Zone issued for Construction.23/07/2012
711ArchitectDT(20)026 Indicative Internal Screen To Column Connection Detail issued for Construction.23/07/2012
712ArchitectPL(20)003 General Arrangement Second Floor Plan issued.23/07/2012
713ArchitectPL(35)001 updated.24/07/2012
714ArchitectDT(22)20 Typical Internal Drylining Wall Details Sheet 01 issued.24/07/2012
715ArchitectDT(22)21 Typical Internal Drylining Wall/Fire Stopping Details Sheet 02 & Fire Stopping to Steelwork at External Walls issued.24/07/2012
716ArchitectDT(22)022 Typical Internal Drylining Wall Details Sheet 03 & steel encasemet detail issued.24/07/2012
717ArchitectDT(22)023 Typical Internal Drylining Wall Details Sheet 04 issued.24/07/2012
718ArchitectPL(42)001 Ground Floor Internal Directional Signage issued for Construction.24/07/2012
719ArchitectPL(42)002 First Floor Internal Directional Signage issued for Construction.24/07/2012
720ArchitectPL(42)003 Second Floor Internal Directional Signage issued.24/07/2012
721ArchitectDT(21)011 Rear Entrance Cladding Details updated.24/07/2012
722ArchitectPL(20)001 drawing issued.25/07/2012
723ArchitectEL(21)008 issued.25/07/2012
724ArchitectPL(68)002 issued.25/07/2012
725ArchitectEL(21)006 issued.25/07/2012
726ArchitectPL(35)001 issued.26/07/2012
727ArchitectUpload of drawring PL(35)001 incorporating ceiling grid to gym.26/07/2012
728ArchitectUpload of TY drawing DT(35)009; Typical Gym Plasterboard / Suspended Ceiling Abutment Detail. First Issue.30/07/2012
729ArchitectUpload of revised TY drawing PL(35)001 omitting suspended ceiling from Gym and installing suspended ceiling in Hall.30/07/2012
730ArchitectUpload of revised TY drawing PL(40)001 to incorporate class A acoustic tile to Hall area.30/07/2012
731ArchitectUpload of new TY drawing DT(20)033; Plan detail of Exchange / Multi Use Space - External Wall Threshold. Update of TY drawing DT(22)005 to incorporate Jumbe stud - detail 03.31/07/2012
732ArchitectUpload of new TY drawing DT(20)034 - Section detail through multi use space wall along GL:H04. First formal issue.31/07/2012
733ArchitectDT(27)007 issued.01/08/2012
734ArchitectEL(22)011 issued.01/08/2012
735ArchitectDrawing PL(20)001 General Arrangement Ground Floor Plan issued.01/08/2012
736ArchitectDrawing PL(22)004 Ground Floor Internal Masonry Setting Out issued.01/08/2012
737ArchitectPL(22)007 Ground Floor Internal Drylining Setting Out issued.01/08/2012
738ArchitectPL(20)001 General Arrangement Ground Floor Plan issued.02/08/2012
739ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings issued. 03/08/2012
740ArchitectPL(20)002 General Arrangement First Floor Plan issued.06/08/2012
741ArchitectPL(20)003 General Arrangement Second Floor Plan issued.06/08/2012
742ArchitectNBS F10 - Clause 357A added.07/08/2012
743ArchitectPL(22)005 First Floor Internal Masonry Setting Out issued.07/08/2012
744ArchitectPL(22)006 Second Floor Internal Masonry Setting Out issued.07/08/2012
745ArchitectUpload of amended NBS Specification L10 clause 330.16/08/2012
746ArchitectUpload of new drawing EL(78)001 - Musical Note Blind Drawing by request of BBCNL.17/08/2012
747ArchitectUpload of revised GF GA PL(20)001 and Roof GA PL(27)001 following rooflight coordination with WML.21/08/2012
748ArchitectUpload of revised Taylor Young drawing PL(27)001. Rooflights 42/43/44 relocated to avoid steelwork clashes. 22/08/2012
749ArchitectUpload of revised TY first floor reflected ceiling plan incorporating revised roof light locations following WML steel coordination.22/08/2012
750ArchitectUpload of revised drawing PL(35)001 incorporating revised rooflight positions within G31b and G32 following further coordination with WML Structural scheme.22/08/2012
751ArchitectUplift of drawings to construction status: SE(20)010; PL(22)001 to 003 and Maintenance and Access Strategy.23/08/2012
752ArchitectUpload of revised screen schedule incorporating screen SC.G.70.23/08/2012
753ArchitectTaylor Young drawing EL(21)007 updated to reflect North systems actual TV screen sizes - confirmed by AF of BBES.28/08/2012
754ArchitectClarification of masonry wall type 01D to drawing PL(22)004 and NBS F10.35528/08/2012
755ArchitectUpload of new NBS section NBS C45.260 - Chemical DPC 30/08/2012
756ArchitectUpload of PL(24) series drawings following BBCNL instruction to amend from PL(24) to DT(24).04/09/2012
757ArchitectDT(22)010 Typical Internal Masonry Wall Details Sheet 01 Fire Treatment updated with riser separation detail.05/09/2012
758ArchitectUpload of TY drawing DT(31)009 following incorporation of BBCNL drawing comments.05/09/2012
759ArchitectUpload of revised TY drwaing DT(20)020 incorporating BBCNL comments.05/09/2012
760ArchitectRevised NBS L10 in accordance with BBCNL Fusion comments 27/07/12.05/09/2012
761ArchitectUpload of revised M50 specification incorporating skirting colour to clause M50.770.06/09/2012
762ArchitectSteel coordination of Stair 10 - Notes added to ensure further structural design is carried out.07/09/2012
763ArchitectUpload of revised first floor door schedule incorporating corrected door width of D.F.0407/09/2012
764ArchitectSE(20)025 Sports Link Bridge issued.11/09/2012
765ArchitectSE(20)025 Sports Link Bridge updated.12/09/2012
766ArchitectDT(22)024 Sports Link Detail Sheet 01 issued.14/09/2012
767ArchitectUpload of Core Rooflight drawing DT(27)019 - first issue.14/09/2012
768ArchitectDT(22)025 Sports Link Detail Sheet 02 issued.14/09/2012
769ArchitectSE(20)025 Sports Link Bridge updated.14/09/2012
770ArchitectUpload of revised sanitary drawings DT(74)006/007/011/012 following issue of revised structural design.14/09/2012
771ArchitectDT(22)024 Sports Link Detail Sheet 01 updated.18/09/2012
772ArchitectDT(22)025 Sports Link Detail Sheet 02 updated.18/09/2012
773ArchitectDT(21)009 Sports Link North Elevation External Masonry Details updated.18/09/2012
774ArchitectPL(20)013 Lift - G34 - General Arrangement - 17 Person Lift updated.19/09/2012
775ArchitectSE(20)024 ASD Section updated.19/09/2012
776ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings updated.19/09/2012
777ArchitectPL(22)007 Ground Floor Internal Drylining Setting Out updated.26/09/2012
778ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out updated.26/09/2012
779ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out updated.26/09/2012
780ArchitectEL(21)003 Elevation 03 - South West / South East Facing Elevation updated.26/09/2012
781ArchitectDT(24)021 Detail Of Rail Under Stair 03 first issue.27/09/2012
782ArchitectEL(21)003 Elevation 03 - South West / South East Facing Elevation updated.27/09/2012
783ArchitectEL(31)022 Curtain Walling - Rear Facing & Sports Entrance Elevations issued.27/09/2012
784ArchitectEL(21)012 Hidden Elevations - Sheet 03 issued.28/09/2012
785ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out issued.28/09/2012
786ArchitectSC(31)007 Screen Schedule issued.28/09/2012
787ArchitectSC(31)006 Curtain Walling Schedules issued.01/10/2012
788ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings issued.01/10/2012
789ArchitectSC(32)001 External Door Schedule and Door Legend issued.01/10/2012
790ArchitectSC(31)007 Screen Schedule issued.02/10/2012
791ArchitectSC(32)003 Internal Door Schedule - First Floor issued.02/10/2012
792ArchitectPL(20)001 General Arrangement Ground Floor Plan issued.02/10/2012
793ArchitectPL(20)002 General Arrangement First Floor Plan issued.02/10/2012
794ArchitectPL(20)003 General Arrangement Second Floor Plan issued.02/10/2012
795ArchitectPL(27)001 Roof General Arrangement issued.02/10/2012
796ArchitectPL(52)002 First Floor Rainwater Penetration Setting Out issued.02/10/2012
797ArchitectPL(52)001 Ground Floor Rainwater Penetration Setting Out issued.03/10/2012
798ArchitectPL(52)003 Second Floor Rainwater Penetration Setting Out issued.03/10/2012
799ArchitectPL(27)001 Roof General Arrangement issued.03/10/2012
800ArchitectEL(21)006 Elevation 06 - A.S.D. Unit issued.03/10/2012
801ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out issued.11/10/2012
802ArchitectPL(27)001 Roof General Arrangement issued.11/10/2012
803ArchitectPL(20)003 General Arrangement Second Floor Plan issued.11/10/2012
804ArchitectPL(22)006 Second Floor Internal Masonry Setting Out issued.11/10/2012
805ArchitectPL(22)009 Second Floor Internal Drylining Setting Out issued.12/10/2012
806ArchitectMaintenance Strategy for High Level Access issued.22/10/2012
807ArchitectUpload of First Floor penetration setting out drawing; setting out based upon BBES drainage plans.29/10/2012
808ArchitectCW.S.43 Section issued.08/11/2012
809ArchitectDT(20)035 CW.F.43 Section Through G83, F43a, S44a issued.09/11/2012
810ArchitectDT(20)035 CW.F.43 Section Through G83, F43a, S44a issued.09/11/2012
811ArchitectPL(20)002 General Arrangement First Floor Plan issued.09/11/2012
812ArchitectDT(20)035 CW.F.43 Section Through G83, F43a, S44a issued.12/11/2012
813ArchitectDT(20)036 CW.F.35 Section to F35 & S25 issued.12/11/2012
814ArchitectEL(21)003 Elevation 03 - South West / South East Facing Elevation issued.12/11/2012
815ArchitectMaintenance Strategy for High Level Access issued.13/11/2012
816ArchitectEL(31)022 Curtain Walling - Rear Facing & Sports Entrance Elevations issued.13/11/2012
817ArchitectDT(24)010 Stair 10 - General Arrangement and detail drawing issued.14/11/2012
818ArchitectDT(20)036 CW.F.35 Section to F35 & S25 issued.14/11/2012
819ArchitectPL(20)002 General Arrangement First Floor Plan issued.14/11/2012
820ArchitectDT(20)038 Detail For Glazed Screen To Art SC.S.40 issued.20/11/2012
821ArchitectDT(20)036 CW.F.35 Section to F35 & S25 issued.20/11/2012
822Architect121121_SK01 Corridor Proposals To Rear Of Hall issued.21/11/2012
823Architect121121_SK02 Exchange issued.21/11/2012
824ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out issued.22/11/2012
825ArchitectDT(20)039 Tanking Detail to G31b issued.23/11/2012
826ArchitectEL(21)003 Elevation 03 - South West / South East Facing Elevation issued.23/11/2012
827ArchitectPL(20)002 General Arrangement First Floor Plan issued.26/11/2012
828ArchitectPL(20)003 General Arrangement Second Floor Plan issued.29/11/2012
829ArchitectPL(40)001 Ground Floor Finishes Plan issued.29/11/2012
830ArchitectPL(40)001 Ground Floor Finishes Plan Final Construction Issue For New-build29/11/2012
831ArchitectPL(27)001 Roof General Arrangement issued.04/12/2012
832ArchitectPL(27)020 Maintenance Access Strategy Plans issued.04/12/2012
833ArchitectPL(27)016 Roof Edge Protection / Access Barriers issued.04/12/2012
834ArchitectMaintenance Strategy for High Level Access updated.04/12/2012
835ArchitectSC(31)007 Screen Schedule updated.06/12/2012
836ArchitectPL(52)002 First Floor Rainwater Penetration Setting Out updated.06/12/2012
837ArchitectPL(20)002 General Arrangement First Floor Plan updated.06/12/2012
838ArchitectPL(20)006 Grid Setting Out Plan issued.07/12/2012
839ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.10/12/2012
840ArchitectPL(22)009 Second Floor Internal Drylining Setting Out updated.11/12/2012
841ArchitectDT(22)026 F19 Wall Details first issue.11/12/2012
842ArchitectPL(22)009 Second Floor Internal Drylining Setting Out updated.11/12/2012
843ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.11/12/2012
844ArchitectPL(20)002 General Arrangement First Floor Plan drawing re-issued with grid-lines switched-on.12/12/2012
845ArchitectPL(27)002 Roof Openings - Trimmer Positions updated.12/12/2012
846ArchitectPL(68)004 Sports Area 90m ICT Rule GA first issue.12/12/2012
847Architect121107_SK01 Creative Triangle Maintenance Access Strategy updated.13/12/2012
848ArchitectSE(20)001 Section AA issued.14/12/2012
849ArchitectSE(20)001 Section AA updated.14/12/2012
850ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings updated.18/12/2012
851ArchitectPL(27)001 Roof General Arrangement updated.21/12/2012
852ArchitectPL(20)002 General Arrangement First Floor Plan updated.07/01/2013
853ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.07/01/2013
854ArchitectPL(20)001 General Arrangement Ground Floor Plan updated.07/01/2013
855ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings updated.07/01/2013
856ArchitectPL(22)007 Ground Floor Internal Drylining Setting Out updated.07/01/2013
857ArchitectPL(20)002 General Arrangement First Floor Plan updated.07/01/2013
858ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out updated.11/01/2013
859ArchitectDT(24)010 Stair 10 - General Arrangement And Detail Drawing amended.14/01/2013
860ArchitectPL(20)002 General Arrangement First Floor Plan amended.14/01/2013
861ArchitectSC(31)007 Screen Schedule updated.14/01/2013
862ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.14/01/2013
863ArchitectPL(22)015 Refurb. Area Fire Protection first issue.14/01/2013
864ArchitectPL(22)004 Ground Floor Internal Masonry Setting Out updated.16/01/2013
865ArchitectSC(32)001 External Door Schedule and Door Legend updated.16/01/2013
866ArchitectDT(20)037 Stair 10 Cladding Details first issue.17/01/2013
867ArchitectEL(21)009 'Hidden' Elevations - Sheet 01 updated.17/01/2013
868ArchitectNBS L10 Windows updated18/01/2013
869ArchitectPL(23)003 Second Floor Slab Edge/Service Penetration Setting Out updated.18/01/2013
870Architect4858_Maintenance Access Strategy Report bound.23/01/2013
871ArchitectDT(20)039 Tanking Detail to G31b drawing updated.23/01/2013
872ArchitectPL(27)002 Roof Openings - Trimmer Positions updated.23/01/2013
873ArchitectDT(74)006 G31B Ground Floor Dry Male Changing Layout updated.24/01/2013
874ArchitectDT(74)007 G32 - Ground Floor Dry Female Changing Layout updated.24/01/2013
875ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings updated.24/01/2013
876ArchitectPL(27)001 Roof General Arrangement updated.28/01/2013
877ArchitectPL(20)050 Proposed Fitness Room Layout first issue.30/01/2013
878ArchitectPL(20)051 Proposed Community Reception Layout first issue.30/01/2013
879ArchitectPL(20)002 General Arrangement First Floor Plan updated.31/01/2013
880ArchitectPL(20)003 General Arrangement Second Floor Plan updated.31/01/2013
881ArchitectDT(20)035 CW.F.43 Section Through G83, F43a, S44a updated.31/01/2013
882ArchitectSE(20)026 Section Between GL SLC & SLD first issue.06/02/2013
883ArchitectPL(20)001 General Arrangement Ground Floor Plan updated.07/02/2013
884ArchitectDT(20)040 Plan Detail At Interface Of ASD & Existing Dining - first issue.14/02/2013
885ArchitectDT(27)020 Sports Link Rooflight Section first issue.15/02/2013
886ArchitectNBS M20 updated.18/02/2013
887ArchitectPL(20)052 Refurb Render Treatment - to Interface of Former Building - first issue.18/02/2013
888ArchitectEL(31)001 Refurbishment of Existing Elevations sheet 1 updated.19/02/2013
889ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out updated.19/02/2013
890ArchitectPL(27)001 Roof General Arrangement updated.19/02/2013
891ArchitectEL(31)022 Curtain Walling - Rear Facing & Sports Entrance Elevations updated.19/02/2013
892ArchitectPL(20)001 General Arrangement Ground Floor Plan updated.25/02/2013
893ArchitectPL(35)001 Ground Floor Reflected Ceiling Setting Out updated.25/02/2013
894ArchitectPL(22)007 Ground Floor Internal Drylining Setting Out updated.25/02/2013
895ArchitectSC(32)002 Internal Door Schedule - Ground Floor updated.25/02/2013
896ArchitectDT(27)019 Core Rooflight Proposals updated.26/02/2013
897ArchitectPL(27)001 Roof General Arrangement updated.26/02/2013
898ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out updated.26/02/2013
899ArchitectPL(27)002 Roof Openings - Trimmer Positions updated.26/02/2013
900ArchitectPL(20)002 General Arrangement First Floor Plan updated.26/02/2013
901ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.27/02/2013
902ArchitectSC(32)003 Internal Door Schedule - First FloorInternal Door Schedule - First Floor updated.27/02/2013
903ArchitectPL(20)001 General Arrangement Ground Floor Plan updated.27/02/2013
904ArchitectPL(22)007 Ground Floor Internal Drylining Setting Out updated.27/02/2013
905ArchitectSC(32)002 Internal Door Schedule - Ground Floor updated.27/02/2013
906ArchitectPL(27)001 Roof General Arrangement updated.27/02/2013
907ArchitectPL(40)001 Ground Floor Finishes Plan updated.28/02/2013
908ArchitectPL(40)001 Ground Floor Finishes Plan updated.28/02/2013
909ArchitectPL(40)002 First Floor Finishes Plan updated.01/03/2013
910ArchitectPL(40)003 Second Floor Finishes Plan01/03/2013
911ArchitectSC(32)001 External Door Schedule and Door Legend updated.04/03/2013
912ArchitectDT(21)005 Sports Hall Link Building - External Masonry updated.04/03/2013
913ArchitectDT(21)016 Sports Link Section On GL SL3 first issue.06/03/2013
914ArchitectPL(20)003 General Arrangement Second Floor Plan updated.06/03/2013
915ArchitectPL(20)024 Existing Basement Possible Vent Routes - first issue.06/03/2013
916ArchitectDT(34)005 Sports Link Ramp Balustrade Detail updated.06/03/2013
917ArchitectEL(21)010 'Hidden' Elevations - Sheet 02 updated.06/03/2013
918ArchitectEL(31)022 Curtain Walling - Rear Facing & Sports Entrance Elevations updated.07/03/2013
919ArchitectPL(23)002 First Floor Slab Edge/Service Penetration Setting Out updated.13/03/2013
920ArchitectPL(23)001 Ground Floor Slab Edge Setting Out Drawings updated.13/03/2013
921ArchitectF19 Amendments - ANC 039 - first issue.14/03/2013
922ArchitectPL(22)008 First Floor Internal Drylining Setting Out updated.14/03/2013
923ArchitectPL(20)002 General Arrangement First Floor Plan updated27/03/2013
924ArchitectSC(32)003 Internal Door Schedule - First Floor updated.27/03/2013
925ArchitectSC(31)007 Screen Schedule updated.27/03/2013
926ArchitectEL(31)002 Refurbishment of Existing Elevations sheet 2 updated.05/04/2013
927ArchitectUpload and issue of sketch drarwings SK01 to SK04 130411 illustrating typical detail around sports link building adjacent existing hall.11/04/2013
928ArchitectSE(20)024 updated.25/04/2013
929ArchitectGround Floor Reflected Ceiling Setting Out updated.30/04/2013
930ArchitectPL(35)002 First Floor Reflected Ceiling Setting Out updated.30/04/2013
931ArchitectPL(22)007 Ground Floor Internal Drylining Setting Out updated.01/05/2013
932ArchitectIssue of drawing PL(20)52 and EL(21)003 to capture change of material to external facade of retained core block. Drawings issued to LPA for approval.21/06/2013
933ArchitectUpload of revised drawing EL(21)003 including additional areas of render as identified by BBCNL26/06/2013
934ArchitectUpload of Final Issue drawings16/08/2013
935ArchitectUpload of final issue sectuion drawings to BBCNL.02/09/2013
936ArchitectUpdate of drawing PL(27)016 for inclusion within high level access and maintenance document.13/09/2013